Project Details
Timeline30 Months
Scale450,000 sqft
Budget$85M
Core MaterialsRecycled Steel, Solar Glass
The Vision
Advanced clean tech industrial facility utilizing next-generation architectural frameworks to maximize sustainability.
The Challenge
Designing an industrial facility that operates at net-zero energy consumption in a high-temperature climate.
The Solution
Integrated massive photovoltaic arrays into the roof structure and utilized passive cooling techniques via wind towers inspired by traditional regional architecture.
